Inprocess

Dynamic Simulation Study for the modification of a FPSO located in Ghana

  • 2016
  • Oil & Gas
  • FPSO/FSO EPC (USA office)

New fields have been discovered in Ghana region. It is intended to produce from these discoveries to the FPSO. Based on the fact that the gas capacity is increasing, it requires both trains of MP, HP, and gas Injection Compressors to be in operation to accommodate the final production. Since this is not how the gas system was originally designed, there are concerns about the control of two compression trains operating in parallel and Dynamic Simulation Studies are required to be carried out by Inprocess in order to address these concerns.

Related Industries